14 May 2013

Basement Walls

We were scheduled to pour basement walls about 13:00 this afternoon, but Jody was so meticulous about the squareness of the house that we didn't actually start the pour until much later!  That's dedication!



Trucks 1 and 2 (of 6) - each carries 8-10 yards of concrete.

Jody and Gentry working the front wall (BR2) with truck #1.

"Boo" and Dave working the front door and "Nook" area with the 2nd truck.

Work progresses

A little over 50 yards was poured, in total.

Almost done - a little after 19:00 hours.


Tmw, the guys will remove the forms and then pour the 4' walls for the carport / shed.
 
3 small basement windows were placed, along with a larger egress windows.  They also placed "plugs" for all utility lines, in and out of the basement.  Almost everything that enters the home will do so below final grade!